Event schedule

Help, problems, suggestions about Waterski Scoring software
Gamster
Posts: 19
Joined: Sun Aug 16, 2015 11:38 am

Event schedule

Post by Gamster »

I believe it is only possible to establish the order of events by allocating an actual time for each event. Is it possible to set it up using the numbered index on the left of the window as the order and just indicating a start time for each day, with the rest of the events following in the numerical order? I tried to make the software do that but the only way I found to change the order was to change the actual time of day assigned to it.

Thanks
Andy
London, UK
emmanuel
Site Admin
Posts: 276
Joined: Fri May 20, 2005 8:34 am
Contact:

Re: Event schedule

Post by emmanuel »

Hi Andy,

There are 2 arrow buttons to re-arrange order for event with the same time (or no time).
But the best way is to assign date and time to each event, even if not displayed.
Then in "display time" it is possible to display something like "Following" ´...

Regards,
Emmanuel
Gamster
Posts: 19
Joined: Sun Aug 16, 2015 11:38 am

Re: Event schedule

Post by Gamster »

OK and thanks for the clarification. Perhaps being able to order the schedule using just the numbered column as the controlling index (without the need to allocate a date and time for each event) could be an idea for future releases?

Cheers
Andy
London, UK
Post Reply